Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.


Excerpt

Required if Late Finish Offset Type = Percentage; Percentage of Average Duration to use as an offset.  The late finish time is calculated by adding the offset to the Average Duration. (Minimum = 0 and Maximum is = 1000)