...
Condition | Connector Format | Description | ||||||
---|---|---|---|---|---|---|---|---|
Success | Solid black line | Run the successor task if the predecessor task goes to Success. | ||||||
Failure | Dotted black line | Run the successor task if the predecessor task goes to Failure. | ||||||
Success/Failure | Dotted black line | Run the successor task if the predecessor task goes to Success or Failure. | ||||||
Variable | Dotted black line | Run the successor task if the variable condition specified in the variable window is met.
| ||||||
| Dotted black line | Run the successor task if the predecessor task returns one of the specified exit code(s). Format: Numeric. Use commas to list a series of exit codes; use hyphens to specify a range. Example: 1,5, 22-30. | ||||||
Dotted gray line | For predecessor z/OS tasks only: Run the successor task if the running predecessor z/OS task has a step end matching the specified Step Condition(s). |
...
Task Type | Success | Failure | Success/Failure | Step Condition(s) | Variable | Exit Code(s) |
---|---|---|---|---|---|---|
![]() | ||||||
![]() | ||||||
![]() | ||||||
![]() | ||||||
![]() | ||||||
![]() | ||||||
![]() | ||||||
![]() | ||||||
![]() | ||||||
![]() | ||||||
![]() | ||||||
![]() | ||||||
![]() | ||||||
![]() | ||||||
Recurring | ![]() | ![]() | ![]() | ![]() | ![]() | |
![]() | ||||||
![]() | ||||||
![]() | ||||||
![]() | ||||||
![]() | ||||||
![]() | ||||||
![]() | ||||||
![]() |
Anchor | ||||
---|---|---|---|---|
|
...