  1. Click
  1. the
  1. first
  1. step
  1. that
  1. you
  1. want
  1. included
  1. in
  1. the
  1. re-run.
<li>
  1. Press
  1. and
  1. hold
  1. the
  1. <Shift>
  1. key.
<li>
  1. Click
  1. the
  1. last
  1. step
  1. that
  1. you
  1. want
  1. included
  1. in
  1. the
  1. re-run.
<li>
  1. Right-click
  1. any
  1. step
  1. in
  1. the
  1. selected
  1. group
  1. to
  1. display
  1. an
  1. Action menu
. <li> Click <b>Select for Re-run</b>. </ol>
  1. .
  2. Click Select for Re-run.

(You also can right-click a step and select Select to End for Re-run to include that selected step and all following steps in the re-run.)
 
If you want to de-select a job step in the group for inclusion in the re-run, right-click the step and, in the Action menu, click Deselect for Re-run.
 


Step 1

On the Activity Monitor, click the Details icon next to the Instance Name of the task you want to re-run. The z/OS Task Instance Details displays.

Step 2

Click the Restartable Job Steps tab to display a list of all job steps in the task.
 

 
Check the Restartable column to see from which steps you can start the re-run (Yes or No).
 
If applicable, the Failed column indicates at which step(s) the task failed.

Step 3

Assuming any failures were caused by error(s) in the JCL, examine the JCL and make your corrections. The Controller uses a background process to determine whether changes have been made to the JCL. Any changes trigger a confirmation process.

Step 4

Click the Details icon next to the Step Number of any step to see detail information about that step.
 

Step 5

From the Restartable Job Steps list, select the steps that you want included in the re-run:

Html bobswift
Html bobswift
Html bobswift

Step 6

Click the z/OS Task Instance tab to redisplay the z/OS Task Instance Details.

Step 7

Click the Re-run button to re-run the task for the selected job steps.

Step 8

If you have made changes to the JCL, the task instance goes into a status of Confirmation Required on the Activity Monitor.
 
To confirm the changes:

  1. From the Activity Monitor, open the task instance.
  2. Click the Confirm JCL Changes tab to display a list of all changes that were made to the JCL:
     

     
  3. Click the Confirm button at the top of the list.
  4. Click the z/OS Task Instance tab. Verify that the JCL Changes Confirmed field is checked and then click the Re-run button.
Note
titleNote

If a z/OS task instance transitions into the Confirmation Required status, and the Controller determines that the number of steps did not change, it preserves the step re-run selection.

However, if the Controller detects a change in the number of steps, all steps will be de-selected.


Step 9

After the re-run is complete, the Failed column in the Restartable Job Steps list should show No for each step.
 

Note
titleNote

If you repeat the above process on the same task instance, the previous list of JCL changes, if any, is replaced with the most recent list of changes.


...