Step 1

Select a task from a Tasks list and, in the task Details for that task, click the Virtual Resources tab. The Task Virtual Resources list displays.
 
Image RemovedImage Added

Step 2

Click the New button. The Task Virtual Resources Details dialog displays.
 
Image RemovedImage Added

Step 3

Using the field descriptions, below, as a guide, complete the fields as needed.

Step 4

Click a Save button to save the record and return to the Task Virtual Resources list.

Step 5

If appropriate, repeat these steps for any additional Task Virtual Resources that you want to add.

...

Step 1

Select a task from a Tasks list and, in the task Details for that task, click the Virtual Resources tab. The Task Virtual Resources list displays.
 
Image RemovedImage Added

Step 2

Click the Edit button the Image Added button to display the Edit Member dialog.
 
Image RemovedImage Added
 

  • The Collection window displays all Virtual Resources that have not been assigned to this task.
  • The Virtual Resource List window displays all Virtual Resources that have been assigned to this task.

Step 3

If you want to filter the tasks in the Collection window, click the filter icon (see Filtering for information about how to construct a filter.)

Step 4

Move virtual resources from the Collection window to the Virtual Resource List window:

  • To move a single virtual resource, double-click it or click it once and then click the > arrow.
  • To move multiple virtual resources, Ctrl-click them and then click the >  arrow.
  • To move all virtual resources, click the >> arrow.

To move virtual resources from the Virtual Resource List window to the Collection window:

  • To move a single virtual resource, double-click it or click it once and then click the < arrow.
  • To move multiple virtual resources, Ctrl-click them and then click the < arrow.
  • To move all virtual resources, click the << arrow.

Step 5

Click Save.

...

Field Name

Description

Details

This section contains details for the task virtual resource.

Anchor
Resource
Resource
Resource

Allows you to select an existing Virtual Resource as a Task Virtual Resource for this task.
 
Clicking the Virtual Resources Details icon next to the Resource field allows you to create a new Virtual Resource, but that does not automatically add it to the list of Task Virtual Resources for this task.

Anchor
Resource Variable
Resource Variable
Resource Variable

Include Page
UC69IL:Resource VariableUC69
IL:Resource Variable

Amount

Number of resource units required from the Virtual Resource.

Buttons

This section identifies the buttons displayed above and below the Step Action Details that let you perform various actions.

Save

Saves the new System Operation Step Action Details record in the Controller database.

Save & New

Saves a new record in the Controller database and redisplays empty Details so that you can create another new record.

Save & View

Saves a new record in the Controller database and continues to display that record.

Update

Include Page
UC69IL:Update buttonUC69
IL:Update button

Delete

Include Page
UC69IL:Delete buttonUC69
IL:Delete button

Refresh

Refreshes any dynamic data displayed in the Details.

Close

For pop-up view only; closes the pop-up view of this task.

...

Step 1

Open a task instance Detail.

Step 2

Click the Virtual Resources tab on the task instance Details to display the Virtual Resources lists for the task instance:


Image RemovedImage Added

Step 3

Click the Details icon next to any resource on these list to view details about the resource.

...

Field Name

Description

Virtual Resource

Name of the Virtual Resource.

Resource Type

Type of Virtual Resource:

  • Renewable
  • Boundary
  • Depletable

Amount Requested

Number of Virtual Resource units requested.

Updated By

User that last updated this record.

Updated

Date and time this record was last updated.

...


Anchor
Task Instance Virtual Resources
Task Instance Virtual Resources
Task Instance Virtual Resources

...

Field Name

Description

Resource

Name of the task instance virtual resource.

Resource Unresolved

Name of a variable that will be resolved at run time to the name of the Virtual Resource.

Resource Variable

Indication of whether the Resource field of this task instance virtual resource specifies a variable (Yes) or a Virtual Resource (No).

Resource Type

Type of Virtual Resource:

  • Renewable
  • Boundary
  • Depletable

Amount

Number of Virtual Resource units used.

Updated By

User that last updated this record.

Updated

Date and time this record was last updated.

...

...



Note
titleNote:

Virtual Resource variables will be resolved by the Task Instance at run-time when checking if resources are required. The resolved values will not be saved; the Task Instance Virtual Resource List will continue to show unresolved values.

If a Virtual Resource variable cannot be resolved, the Task Instance will transition to a Start Failure status.

If a resolved Virtual Resource does not exist, the Task Instance will transition to a Start Failure status.

If there are duplicate Virtual Resources with conflicting Amount values, the Task Instance will transition to a Start Failure status.

...

Step 1

Display the Virtual Virtual Resources lists for a task instance.

Step 2

At the top of the Task Instance Virtual Resources list, click the New button Image Added button to display a Task Instance Virtual Resource Details dialog.
 
Image RemovedImage Added

Step 3

Select / enter values for the task instance virtual resource (see Creating Task Virtual Resources#Task Virtual Resources Field Descriptions).

STep 4

Click the Save button to assign the virtual resource to this task instance.

...