PeopleSoft Task

Overview

Note

These instructions assume the user has a working knowledge of PeopleSoft.

The PeopleSoft task allows you to send commands to a PeopleSoft system and gather status information and output back from PeopleSoft. The PeopleSoft task uses Stonebranch's proprietary Universal Connector for PeopleSoft (UPPS) to communicate with PeopleSoft . Universal Connector for PeopleSoft allows Universal Controller to connect to a PeopleSoft system and manage PeopleSoft background processing tasks.

Before You Begin

To run a PeopleSoft task, you must first complete the following:

Built-In Variables

The following built-in variables can be used in a PeopleSoft task to pass data where appropriate:

Creating a PeopleSoft Task

Step 1

From the Automation Center navigation pane, select Tasks > PeopleSoft Tasks. The PeopleSoft Tasks list displays a list of all currently defined PeopleSoft tasks.
 
To the right of the list, PeopleSoft Task Details for a new PeopleSoft task displays.
 

Step 2

Enter/select Details for a new PeopleSoft task, using the field descriptions below as a guide.

  • Required fields display an asterisk ( * ) after the field name.
  • Default values for fields, if available, display automatically.

To display more of the Details fields on the screen, you can either:

  • Use the scroll bar.
  • Temporarily hide the list above the Details.
  • Click the  button above the list to display a pop-up version of the Details.

Step 3

Click the  button. The task is added to the database, and all buttons and tabs in the Task Details are enabled.

Note

To open an existing record on the list, either:

  • Click a record in the list to display its record Details below the list. (To clear record Details below the list, click the New button that displays above and below the Details.)
  • Clicking the Details icon next to a record name in the list, or right-click a record in the list and then click Open in the Action menu that displays, to display a pop-up version of the record Details.
  • Right-click a record in the a list, or open a record and right-click in the record Details, and then click Open In Tab in the Action menu that displays, to display the record Details under a new tab on the record list page (see Record Details as Tabs).

PeopleSoft Task Details

The following PeopleSoft Task Details is for an existing PeopleSoft task.

Depending on the values that you enter / select for these fields, and whether or not the PeopleSoft task has ever been launched, more (or less) fields may display. See the field descriptions, below, for a description of all fields that may display in the PeopleSoft Task Details.
 

PeopleSoft Task Details Field Descriptions

The following table describes the fields, buttons, and tabs that display in the PeopleSoft Task Details.

Field Name

Description

General

This section contains general information about the task.

Name

User-defined name of this task (Maximum = 255 alphanumeric characters); variables supported. It is the responsibility of the user to develop a workable naming scheme for tasks.

Version

System-supplied; version number of the current record, which is incremented by the Controller every time a user updates a record. Click the Versions tab to view previous versions. For details, see Record Versioning.

Description

Description of this record. Maximum length is 255 characters.

Member of Business Services

User-defined; Allows you to select one or more Business Services that this record belongs to.  (You also can Check All or Uncheck All Business Services for this record.)

You can select up to 62 Business Services for any record type, and enter a maximum of 2048 characters for each Business Service.

If the Business Service Visibility Restricted Universal Controller system property is set to true, depending on your assigned (or inherited) Permissions or Roles, Business Services available for selection may be restricted.

Resolve Name Immediately

If enabled, the Instance Name of the task instance will be resolved immediately at trigger/launch time.

Time Zone Preference

User-defined; Allows you to specify the time zone that will be applied to the task.

Options:

  • – System Default –
    Time zone is based on the value of the Task Time Zone Preference Universal Controller system property: Server or Inherited.
  • Server (xxx)
    Where (xxx) is the time zone ID of the server; time zone is evaluated in the time zone of the server.
  • Inherited
    Time zone is evaluated in the time zone of the Parent Workflow or Trigger / Launch specification in the case there is no Parent Workflow.

Hold on Start

If enabled, when the task is launched it appears in the Activity Monitor with a status of Held. The task runs when the user releases it.

Hold Reason

Information about why the task will be put on hold when it starts.

Virtual Resource Priority

Priority for acquiring a resource when two or more tasks are waiting for the resource. This priority applies to all resources required by the task.

Options: 1 (high) - 100 (low).

Default is 10.

Hold Resources on Failure

If enabled, the task instance will continue to hold Renewable resources if the task instance fails. Renewable resources will be returned only if the task instance status is either Complete, Finished, or Skipped.

Mutually Exclusive With Self

If enabled, the task will not be allowed to run concurrently with itself. Task will not start until the instance that is running finishes. An instance will transition to Exclusive Wait status if it cannot start due to another instance already running. 

Simulate 

Specifies if the instance should execute under simulation mode

Agent Details

This section contains assorted detailed information about the Agent / Agent Cluster selected for this task.

Cluster

Indication that selecting a Utility Agent Cluster is required.  If Cluster is selected, selecting a Utility Agent is not required unless Utility Agent Variable is selected.

Utility Agent

Name of the Agent resource that identifies the machine where the operation will run. If you do not specify a Utility Agent, you must specify a Utility Agent Cluster or Utility Cluster Broadcast.

Utility Agent Variable

If enabled, the Utility Agent field converts from a reference field (where you browse and select a record) into a text field that allows you to enter a variable. Use the format:

${variable name}.

The variable must be a supported type as described in Variables and Functions.
 

Note

When updating multiple Tasks, to change from using a Utility Agent reference to using a Utility Agent variable, you must change the Utility Agent Variable field to Yes and specify the Utility Agent variable in the Utility Agent Unresolved field. Conversely, to change from using a Utility Agent variable to using a Utility Agent reference, you must change the Utility Agent Variable field to No and specify the Utility Agent reference in the Utility Agent field.

Utility Agent Cluster

If Cluster is selected; Group of Agents, one of which the Controller will choose to run this task. You can specify a Utility Agent Cluster in addition to or in place of a specific Utility Agent. If you specify a Utility Agent and a Utility Agent Cluster, the Controller first tries to run the task on the specific Utility Agent. If the Utility Agent is not available, the Controller reverts to the Utility Agent Cluster. See Agent Clusters for more information.

Utility Agent Cluster Variable

Indication of whether the Utility Agent Cluster field is a reference field for selecting a specific Agent Cluster (unchecked) or a text field for specifying the Utility Agent Cluster as a variable (checked). Use the format:

${variable name}.

The variable must be a supported type as described in Variables and Functions.
 

Note

When updating multiple Tasks, to change from using a Utility Agent Cluster reference to using a Utility Agent Cluster variable, you must change the Utility Agent Cluster Variable field to Yes and specify the Utility Agent Cluster variable in the Utility Agent Cluster Unresolved field. Conversely, to change from using a Utility Agent Cluster variable to using a Utility Agent Cluster reference, you must change the Utility Agent Cluster Variable field to No and specify the Utility Agent Cluster reference in the Utility Agent Cluster field.

Utility Credentials


Login credentials that the Agent will use to access the Universal Command server machine.

Required if the Agent Credentials Required Universal Controller system property is true.

Utility Credentials Variable

Indication of whether the Utility Credentials field is a reference field for selecting a specific Credential (unchecked) or a text field for specifying the Utility Credentials as a variable (checked). Use the format: ${variable name}. The variable must be a supported type as described in Variables and Functions.
 

Note

When updating multiple Tasks, to change from using a Utility Credentials reference to using a Utility Credentials variable, you must change the Utility Credentials Variable field to Yes and specify the Utility Credentials variable in the Utility Credentials Unresolved field. Conversely, to change from using a Utility Credentials variable to using a Utility Credentials reference, you must change the Utility Credentials Variable field to No and specify the Utility Credentials reference in the Utility Credentials field.

PeopleSoft Details

This section contains assorted detailed information about the task.

PeopleSoft Connection


Name of the PeopleSoft connection. The PeopleSoft connection specifies information about the PeopleSoft server. Select an existing PeopleSoft Connection from the drop-down list or click the icon to create a new PeopleSoft Connection.

PeopleSoft Connection Variable

Indication of whether the PeopleSoft Connection field is a reference field for selecting a specific PeopleSoft Connection (unchecked) or a text field for specifying the PeopleSoft Connection as a variable (checked). Use the format: ${variable name}.

The variable must be a supported type as described in Variables and Functions.
 

Note

When updating multiple Tasks, to change from using a PeopleSoft Connection reference to using a PeopleSoft Connection variable, you must change the PeopleSoft Connection Variable field to Yes and specify the PeopleSoft Connection variable in the PeopleSoft Connection Unresolved field. Conversely, to change from using a PeopleSoft Connection variable to using a PeopleSoft Connection reference, you must change the PeopleSoft Connection Variable field to No and specify the PeopleSoft Connection reference in the PeopleSoft Connection field.

PeopleSoft Credentials


Login credentials that the Controller will use to access the PeopleSoft system. The credentials are stored in the Universal Controller credentials table; see Credentials.
 

Note

Either the PeopleSoft Connection or the PeopleSost task using that connection must specify PeopleSoft Credentials. If a PeopleSoft task using the PeopleSoft Connection specifies PeopleSoft Credentials, those PeopleSoft task credentials override the PeopleSoft Connection credentials.

PeopleSoft Credentials Variable

Indication of whether the Credentials field is a reference field for selecting a specific Credential (unchecked) or a text field for specifying the Credential as a variable (checked). Use the format: ${variable name}.

The variable must be a supported type as described in Variables and Functions.
 

Note

When updating multiple Tasks, to change from using a Credentials reference to using a Credentials variable, you must change the Credentials Variable field to Yes and specify the Credentials variable in the Credentials Unresolved field. Conversely, to change from using a Credentials variable to using a Credentials reference, you must change the Credentials Variable field to No and specify the Credentials reference in the Credentials field.

Command

PeopleSoft command to execute.

Options:

  • Schedule Process
    Schedule a process.
  • Schedule Job
    Schedule a job.
  • Run Jobset
    Run a job.

Default is Schedule Process.

Run Control ID

If Command = Schedule Process or Schedule Job; Run control ID to be used for the process submission.

Process Type

If Command = Schedule Process or Schedule Job; Specific type of PeopleSoft process. (If Command = Schedule Job, Process Type defaults to PSJob and is read-only.)

Process/Job Name

If Command = Schedule Process or Schedule Job; Name of the PeopleSoft process/job.

Server Name

If Command = Schedule Process or Schedule Job; Specific server name. If Command = Schedule Process or Schedule Job; Specific server name.

Output Destination Type

If Command = Schedule Process or Schedule Job; Type of output for the submitted process.

Output Destination Format

If Command = Schedule Process or Schedule Job; Override of the default output format for the submitted process.

Output Destination String

If Command = Schedule Process or Schedule Job; File path or printer destination for the output.

Process File Name

If Command = Schedule Process or Schedule Job; Dependent file name.

Main Schedule Name

If Command = Run Jobset; Name of the jobset schedule.

Main Job Name

If Command = Run Jobset; Name of the job within the jobset schedule.

Print Distribution List

Specification for whether or not the report-recipient distribution list is included in the Job Report.

Print Parameter List

Specification for whether or not the parameter list job items are included in the Job Report.

Print Application Message

Specification for whether or not the application messages for the monitored processes are included in the Job Report.

Print System Message

Specification for whether or not the application messages for the monitored processes are included in the Job Report.

Print Job Tree

Specification for whether or not the job tree is included in the Job Report.

Report

Specification for whether or not reports associated with a process are returned.

Content Filter

Comma-delimited list of report file suffixes that will not be returned. For example: pdf,xls

PeopleSoft Distribution Details

If Command = Schedule Process or Schedule Job; This section contains assorted distribution details about the task.

Report Folder Name

If Command = Schedule Process or Schedule Job; Folder in which the report will be viewed in Report Manager.

Retention Days

If Command = Schedule Process or Schedule Job; Number of days that reports generated by the submitted process should be retained by the system.

Email Address List

If Command = Schedule Process; List of email addresses, separated by semicolons.

Email Subject

If Command = Schedule Process; Subject line of the email. If not specified, the default subject line is used.

Email Text

If Command = Schedule Process; Body of the email. If not specified, the default body message is used.

Email With Log

If Command = Schedule Process; Indication (checked or unchecked) for whether or not to attach log files resulting from the Structured Query Report. Only applicable if Process Type = SQR Report.

Email Web Report

If Command = Schedule Process; Indication (checked or unchecked) for whether or not to include a link to the completed report output. Only applicable if Output Destination Type = WEB.

Distribution Options

If Command = Schedule Process; Recipients of the process output

To add an option, click the + icon and enter:

  • Distribution Id Type: User or Role
  • Distribution Id

To delete an option, select in the list of variables and click the - icon.

Result Processing Details This section contains assorted detailed information about result processing for this task.

Exit Code Processing

Specifies how the Controller should determine whether the executed command failed or completed successfully.

Options:

  • Success Exitcode Range
    Command is considered completed successfully if its exit code falls within the range specified in the Exit Codes field.
  • Failure Exitcode Range
    Command is considered failed if its exit code falls within the range specified in the Exit Codes field.
  • Success Output Contains
    Command is considered completed successfully if its output contains the text specified in the Scan Output For field.
  • Failure Output Contains
    Command is considered failed if its output contains the text specified in the Scan Output For field.
  • Step Conditions (z/OS only)
    Command is considered completed successfully/failed if any of its specified condition codes falls within the range specified under the Step Conditions tab (see Creating Step Conditions).

Output Type

Required if Exit Code Processing = Success Output Contains or Failure Output Contains; type of output.

Options:

  • Standard Output (STDOUT)
  • Standard Error (STDERR)
  • File
  • Extension

Scan Output For

Required if Exit Code Processing = Success Output Contains or Failure Output Contains; text for which the Controller should scan the output file. The Controller will process this field as a regular expression.

Output File (for Exit Code Processing)

Required if Output Type = File; path and file name of the output file that should be scanned for the text in the Scan Output For field.

Exit Codes

Required if Exit Code Processing = Success Exitcode Range or Failure Exitcode Range; range of exit codes. Format: Numeric. Use commas to list a series of exit codes; use hyphens to specify a range. Example: 1,5, 22-30.

Variables are supported.

Automatic Output Retrieval

Specifies whether you want the Controller to automatically retrieve any output from the job and attach it to the task instance record.

Options:

  • None
    Do not attach any output to the task instance record.
  • Standard Output
    Attach all standard output.
  • Standard Error
    Attach standard error output.
  • File
    Attach the file specified in the Output File field.
  • Standard Output/Error
    Attach all standard output and standard error output.
     

Note

Tasks specifying Automatic Output Retrieval will fail with Start Failure if the Agent Output Prohibited field is true in the Details of the specified Agent.

Wait For Output

If Automatic Output Retrieval = Standard Output, Standard Error, File, or Standard Output/Error, and Failure Only is not enabled (checked); Specification that the task should wait for the requested output before completing.

Failure Only

If Automatic Output Retrieval = Standard Output, Standard Error, File, or Standard Output/Error, and Wait For Output is not enabled (checked); Indication for whether output should be retrieved on task failure only.

Start Line

If Automatic Output Retrieval = Standard Output, Standard Error, File, or Standard Output/Error; Instructs the Controller to retrieve data beginning at the line indicated.

  • If a Start Line value is not specified, the default is 1.
  • If the Start Line value is -1, data will be retrieved starting at the end of the file.

Number of Lines

If Automatic Output Retrieval = Standard Output, Standard Error, File, or Standard Output/Error; Allows you to limit the retrieved data to the number of lines specified. If a Number of Lines value is not specified, the default is the value of the Retrieve Output Default Number Of Lines Universal Controller system property.

Scan Text

If Automatic Output Retrieval = Standard Output, Standard Error, File, or Standard Output/Error; Regex pattern that the Controller will search for a match for in STDOUT/STDERR or a specified file. The Controller will include the Number of Lines above and below the first line matched.
 
if the Regex pattern is not found, the following message is returned: OPSWISE WARNING - Scan text string not found.

Output File (for Automatic Output Retrieval)

Required if Automatic Output Retrieval = File; path and file name containing the output that you want automatically retrieved and attached to the task instance.

Retry Options

This section contains specifications for retrying the task.

Maximum Retries

User-defined; maximum number of times that the Controller should retry this task after it has started and gone to a failed state.

Retry Indefinitely

User-defined; indicates whether the Controller should continue trying indefinitely to run this task. If you enable this field, it overrides any value placed in the Maximum Retries field.

Retry Interval (Seconds)

User-defined; number of seconds between each retry.

Suppress Intermediate Failures

User-defined; If the task instance is in the Failed status, indicates whether or not the following will be suppressed until all scheduled retry attempts (a Maximum Retries value has been entered or Retry Indefinitely has been enabled) have been made:

  • Workflow conditional path processing; any Successors waiting on a failure path will not be released.

  • Task Monitors will not be notified of the Failed status. Also, any Task Monitor task that has a Time Scope in the past will disqualify any matching task instance in the past with a Failed status if the task instance is scheduled for automatic retry and for which Suppress Intermediate Failures has been enabled.

  • Any Workflow containing the Failed task instance will not transition to the Running/Problems status.


Wait / Delay Options

This section contains specifications for waiting to start and/or delaying on start the task.

Wait To Start

Amount of time to wait before starting a task from the time that it was launched.
 
Options are:

  • – None –
  • Time
  • Relative Time
  • Duration
  • Seconds

Wait Time

If Wait To Start = Time or Relative Time; Time of day (in 24-hour time) to wait until before starting the task. 

Wait Day Constraint

If Wait To Start = Time or Relative Time; Specification for whether or not to advance the wait time to another day.

Valid values:

  • -- None --
    • If Wait To Start = Time; Advance to the next day if the specified wait time is before the time that the task instance is eligible to start; that is, all dependencies have been met. For example: it is not being held, and it is not waiting on any predecessors.
    • If Wait To Start = Relative Time; Advance to the next day if the specified wait time is before the task instance Trigger Time or, if there is no Trigger Time, before the task instance Launch Time. In the latter case, when a task instance is within a workflow, it will inherit the Launch Time of the top-level parent workflow task instance.
  • Same Day
    Do not advance day.
  • Next Day
    Advance to the next day.
  • Next Business Day
    Advance to the next business day.
  • Sunday
    If today is not Sunday, advance to next Sunday.
  • Monday
    If today is not Monday, advance to next Monday.
  • Tuesday
    If today is not Tuesday, advance to next Tuesday.
  • Wednesday
    If today is not Wednesday, advance to next Wednesday.
  • Thursday
    If today is not Thursday, advance to next Thursday.
  • Friday
    If today is not Friday, advance to next Friday.
  • Saturday
    If today is not Saturday, advance to next Saturday.

Default is – None --.

Wait Duration

If Wait To Start = Duration; Number of days, hours, minutes, and seconds to wait before starting the task.

Wait Duration In Seconds

If Wait To Start = Seconds; Number of seconds to wait before starting the task.

Delay On Start

Amount of time to delay the start of a task, after it has been launched, from the time that it is eligible to start; that is, all dependencies have been met. For example: it is not being held, it is not waiting on any predecessors, or there is no wait time specified.
 
Options are:

  • – None –
  • Duration
  • Seconds

Delay Duration

If Delay On Start = Duration; Number of days, hours, minutes, and seconds to delay after starting the task.

Delay Duration In Seconds

If Delay On Start = Seconds; Number of seconds to delay after starting the task.

Workflow Only

Specification for whether or not to apply the Wait To Start and Delay On Start specifications only if the task is in a Workflow.
 
Options are:

Time Options

This section contains time-related specifications for the task.

Late Start

If enabled, and if the task instance starts after the time or period specified, the task instance is flagged as late. You can specify a time or duration to determine a late start (see Late Start Type). To determine whether a task instance started late, open the task instance and locate the Started Late field; the field is checked if the instance started after the specified time. The Started Late field displays in the task instance Details only if the user specified a Late Start in the task Details.

Late Start Type

Required if Late Start is enabled.

Options:

  • Time - Flag the task if it starts after the specified time.
  • Duration - Flag the task if it starts a certain amount of time after the programmed start time. The task must have a specific start time.

Late Start Time

If Late Start Type = Time; Time after which the task start time is considered late. Use HH:MM, 24-hour time.

Late Start Day Constraint

If Late Start Type = Time; Specification for whether or not to advance the late start time to another day.
 
Valid values:

  • -- None --
    Advance to the next day if the specified late start time is before the Created time of the task instance.
  • Same Day
    Do not advance day.
  • Next Day
    Advance to the next day.
  • Next Business Day
    Advance to the next business day.
  • Sunday
    If today is not Sunday, advance to next Sunday.
  • Monday
    If today is not Monday, advance to next Monday.
  • Tuesday
    If today is not Tuesday, advance to next Tuesday.
  • Wednesday
    If today is not Wednesday, advance to next Wednesday.
  • Thursday
    If today is not Thursday, advance to next Thursday.
  • Friday
    If today is not Friday, advance to next Friday.
  • Saturday
    If today is not Saturday, advance to next Saturday.
  • Nth Day
    Advance to a specific number of days in the future.

Default is – None --.

Late Start Nth Amount

If Late Start Day Constraint = Nth Day; Number of days to advance.

Late Start Duration

If Late Start Type = Duration; Duration (amount of relative time) after which the task is considered to have started late.

For a task within a workflow, the duration is the period between the time the workflow starts and the time the task itself starts. For example, a task might have a Late Start Duration of 60 minutes. If the workflow starts at 9:00 a.m. but the task itself does not start until 10:30, the task has started late.

For a task that is not within a workflow, Late Start Duration has meaning only if the task has been held upon starting. For example, if a task has a Late Start Duration of 60 minutes and the Hold on Start field is enabled, if the task is not released from hold within the amount of time specified in the Late Start Duration field, the task has started late.

Late Finish

If enabled, and if the task instance finishes after the time or period specified, the task instance is flagged as late. You can specify a time or duration to determine a late finish (see Late Finish Type). To determine whether a task instance finished late, open the task instance and locate the Finished Late field; the field is checked if the instance finished after the specified time or lasted longer than expected. This field only appears on the task instance if the user specified a Late Finish in the task definition.

Late Finish Type

Required if Late Finish is enabled.

Options:

  • Time - Flag the task if it finishes after the specified time (see Late Finish Time).
  • Duration - Flag the task if it finishes a certain amount of time after the programmed finish time (see Late Finish Duration). The task must have a specific finish time.
  • Average Duration - Flag the task if it finishes before the average duration (see Average Instance Time) for the task, less an offset (see Late Finish Offset Type), if specified.

Late Finish Offset Type

If Late Finish Type = Average Duration;

Options:

  • Percentage
  • Duration

Late Finish Percentage Offset ( + )

Required if Late Finish Offset Type = Percentage; Percentage of Average Duration to use as an offset.  The late finish time is calculated by adding the offset to the Average Duration.

Late Finish Duration Offset ( + )

Required if Late Finish Offset Type = Duration; Duration to use as an offset.  The late finish time is calculated by adding the offset to the Average Duration

Late Finish Duration Offset Unit

If Late Finish Offset Type = Duration;

Options:

  • Seconds
  • Minutes
  • Hours

Late Finish Time

If Late Finish Type = Time; Time after which the task finish time is considered late. Use HH:MM, 24-hour time.

Late Finish Day Constraint

If Late Finish Type = Time; Specification for whether or not to advance the late finish time to another day.
 
Valid values:

  • -- None --
    Advance to the next day if the specified late finish time is before the Created time of the task instance.
  • Same Day
    Do not advance day.
  • Next Day
    Advance to the next day.
  • Next Business Day
    Advance to the next business day.
  • Sunday
    If today is not Sunday, advance to next Sunday.
  • Monday
    If today is not Monday, advance to next Monday.
  • Tuesday
    If today is not Tuesday, advance to next Tuesday.
  • Wednesday
    If today is not Wednesday, advance to next Wednesday.
  • Thursday
    If today is not Thursday, advance to next Thursday.
  • Friday
    If today is not Friday, advance to next Friday.
  • Saturday
    If today is not Saturday, advance to next Saturday.
  • Nth Day
    Advance to a specific number of days in the future.

Default is – None --.

Late Finish Nth Amount

If Late Finish Day Constraint = Nth Day; Number of days to advance.

Late Finish Duration

If Late Finish Type = Duration; Longest amount of time this task instance should take to run.

Early Finish

If enabled, and if the task instance finishes before the time or period specified, the task instance is flagged as early. You can specify a time or duration to determine an early finish (see Early Finish Type). To determine whether a task instance finished early, open the task instance and locate the Finished Early field; the field is checked if the instance finished before the specified time or did not last as long as expected. This field only appears on the task instance if the user added Early Finish specifications to the task definition.

Early Finish Type

Required if Early Finish is enabled.

Options:

  • Time - Flag the task if it finishes before the specified time (see Early Finish Time).
  • Duration - Flag the task if it finishes a certain amount of time before the programmed finish time (see Early Finish Duration). The task must have a specific finish time.
  • Average Duration - Flag the task if it finishes before the average duration (see Average Instance Time) for the task, less an offset (see Early Finish Offset Type), if specified.

Early Finish Offset Type

If Early Finish Type = Average Duration;

Options:

  • Percentage
  • Duration

Early Finish Percentage Offset ( - )

Required if Early Finish Offset Type = Percentage; Percentage of Average Duration to use as an offset.  The early finish time is calculated by subtracting the offset from the Average Duration.

Early Finish Duration Offset ( - )

Required if Early Finish Offset Type = Duration; Duration to use as an offset. The early finish time is calculated by subtracting the offset from the Average Duration.

Early Finish Duration Offset Unit

If Early Finish Offset Type = Duration;

Options:

  • Seconds
  • Minutes
  • Hours

Early Finish Time

If Early Finish Type = Time; Time before which the task finish time is considered early. That is, enter a time at which the task should still be running. Use HH:MM, 24-hour time.

Early Finish Day Constraint

If Early Finish Type = Time; Specification for whether or not to advance the early finish time to another day.

 
Valid values:

  • -- None --
    Advance to the next day if the specified early finish time is before the Created time of the task instance.
  • Same Day
    Do not advance day.
  • Next Day
    Advance to the next day.
  • Next Business Day
    Advance to the next business day.
  • Sunday
    If today is not Sunday, advance to next Sunday.
  • Monday
    If today is not Monday, advance to next Monday.
  • Tuesday
    If today is not Tuesday, advance to next Tuesday.
  • Wednesday
    If today is not Wednesday, advance to next Wednesday.
  • Thursday
    If today is not Thursday, advance to next Thursday.
  • Friday
    If today is not Friday, advance to next Friday.
  • Saturday
    If today is not Saturday, advance to next Saturday.
  • Nth Day
    Advance to a specific number of days in the future.

Default is – None --.

Early Finish Nth Amount

If Early Finish Day Constraint = Nth Day; Number of days to advance.

Early Finish Duration

If Early Finish Type = Duration; Shortest amount of time this task instance should take to run.

User Estimated Duration

Required if Early Finish Type or Late Finish Type = Average Duration; Estimated amount of time it should normally take to run this task. The Controller uses this information to calculate the User Estimated End Time on a task instance record.

User Estimated Duration is used when the Average Duration is not available; for example, on the first launch of a task.

Critical Path Options

This section contains Critical Path-related specifications for the task.

CP Duration

Optional; Allows you to override the estimated Critical Path Duration of the task when running in a Workflow; used in conjunction with the CP Duration Unit field. In most cases, this field should be left blank, which implies that the Controller will estimate the Critical Path Duration based on historical executions. Valid values are any integer equal to or greater than 0. Variables and Functions are supported.

CP Duration (Resolved)

Displays the current resolved value of the CP Duration field, which may contain variables or functions that will be displayed as unresolved until the task instance starts. The CP Duration (Resolved) field can continue to change value until the task instance starts, at which time CP Duration will display as resolved and CP Duration (Resolved) will no longer be visible unless there was an issue resolving the variables and/or functions contained within CP Duration. If the Controller is unable to resolve CP Duration or it resolves to an invalid value, CP Duration will be ignored and the Controller will estimate the Critical Path Duration based on historical executions.

CP Duration Unit

Type of CP Duration; used in conjunction with the CP Duration field. For example, for a CP Duration of two minutes, specify 2 in the CP Duration field and select Minutes in this field.
 

Options:

  • Seconds
  • Minutes
  • Hours

Default is Minutes.



Workflow Execution Options

This section contains Execution Restriction specifications for the task if it is within a Workflow.

Execution Restriction

Specification for whether or not there is a restriction for this task to be run, skipped, or held.

Options are:

  • -- None -- No restriction for this task.
  • Run Restriction for when this task will be run.
  • Skip Restriction for when this task will be skipped.
  • Hold Restriction for when this task will be held.

If Execution Restriction on a task is Run or Skip, then when it is part of a Workflow that is being launched, the Restriction Period is evaluated. The task instance will be skipped if Execution Restriction is Skip and the date is within the Restriction Period or Execution Restriction is Run and the date is not within the Restriction Period. Execution Restriction can be set to Skip with a Restriction Period of - None -, meaning the restriction is always active and the task will be skipped when it is part of a Workflow.

Restriction Period

If Execution Restriction = Run, Skip, or Hold; Period of time when the task is restricted.

Options are:

  • – None –
    No period of restriction for this task.
  • Before
    Restriction is valid if the date is before the Before Date value.
  • After
    Restriction is valid if the date is after the After Date value.
  • Span
    Restriction is valid if the date is before the Before Date value and after After Date value.
  • On
    Restriction is valid if the date is one of the Date List values.

Before Date

If Restriction Period = Before or Span; Date before which the restriction is valid.

Before Time

If Restriction Period = Before or Span; Time on the selected date before which the restriction is valid.

After Date

If Restriction Period = After or Span; Date after which the restriction is valid.

After Time

If Restriction Period = After or Span; Time on the selected date after which the restriction is valid.

Date List

If Restriction Period = On; Date(s) on which the restriction is valid.

Statistics

This section contains time-related statistics for task instances of the task.

First Execution

System-supplied; End Time of the first instance of this task to complete.

Last Execution

System-supplied; End Time of the last instance of this task to complete.

Last Instance Duration

System-supplied; Amount of time the task took to run the last time it ran.

Lowest Instance Time

System-supplied; Lowest amount of time this task has taken to run.

Average Instance Time

System-supplied; Average amount of time this task takes to run.

Highest Instance Time

System-supplied; Highest amount of time this task has taken to run.

Number of Instances

System-supplied; Number of instances in the database for this task.

Metadata

This section contains Metadata information about this record.

UUID

Universally Unique Identifier of this record.

Updated By

Name of the user that last updated this record.

Updated

Date and time that this record was last updated.

Created By

Name of the user that created this record.

Created

Date and time that this record was created.

Buttons

This section identifies the buttons displayed above and below the Task Details that let you perform various actions.

Save

Saves a new task record in the Controller database.

Save & New

Saves a new record in the Controller database and redisplays empty Details so that you can create another new record.

Save & View

Saves a new record in the Controller database and continues to display that record.

New

Displays empty (except for default values) Details for creating a new task.

Update

Saves updates to the record.

Launch Task


Manually launches the task.

View Parents

Displays a list of any parent Workflow tasks for this task.

Copy

Creates a copy of this task, which you are prompted to rename.

Delete

Deletes the current record.

Note

You cannot delete a task if it is either:

  • Specified in an enabled Trigger.
  • The only task specified in a disabled Trigger.

Refresh

Refreshes any dynamic data displayed in the Details.

Close

For pop-up view only; closes the pop-up view of this task.

Tabs

This section identifies the tabs across the top of the Task Details that provide access to additional information about the task instance.

RunTime Parameters

See Adding RunTime Parameters, below.

Variables


Lists all user-defined variables associated with this record; that is, variables that have been defined for this specific record.

Actions


Allows you to specify actions that the Controller will take automatically based on events that occur during the execution of this task.

Events are:

  • Task instance status
  • Exit codes
  • Late start
  • Late finish
  • Early finish

Actions are:

Abort Action

Abort the task if certain events occur. For details, see Abort Actions.

Email Notification

Send an email if certain events occur. For details, see Email Notification Actions.

Set Variable

Used in tasks and workflows to set a variable based on the occurrence of certain events. For details, see Creating a Set Variable Action within a Task or Workflow.

SNMP Notification

Send an email if certain events occur. For details, see SNMP Notification Actions.

System Operation

Run an Universal Controller system operation based on specified conditions. For details, see System Operation Actions.

Virtual Resources


Lists all Virtual Resources to which this task is assigned.
 
If you want to create a Task Virtual Resource for this task, you can select an existing Virtual Resource (or, optionally, first create a new Virtual Resource and then select it as the Task Virtual Resource) or enter a Virtual Resource variable. The variable must be a supported type as described in Variables and Functions.

Mutually Exclusive


Lists all tasks that have been set to be mutually exclusive of this task.

Instances

Lists all instances of the task.

Triggers

List of all triggers that reference this task in the Task(s) field of the trigger Details; that is, a list of all triggers that have been defined to launch this task. Also allows you to add new triggers. If you add a new trigger from this location, the Controller automatically constructs a default trigger name as follows: <current task name>#TRIGGER#. You can change the default name if desired. For instructions on creating triggers, see Triggers.

Notes


Lists all notes associated with this record.

Versions


Stores copies of all previous versions of the current record. See Record Versioning.

Options Fields

Five PeopleSoft Task fields allow you to populate their drop-down lists with options retrieved from the PeopleSoft system:

  • Process Type
  • Process/Job Name
  • Server Name
  • Output Destination Type
  • Output Destination Format

To select the options for a field, click the refresh picker icon next to its drop-down list to display a Refresh Options... dialog. There is a different Refresh Options... dialog for each options field (see below).

Most of the fields on a Refresh Options... dialog are fields from the PeopleSoft Task Details, and the values for those fields in the dialog are, by default, the same as the values for the fields in the Details. You can keep the current values or change them from their drop-down lists.

When you click the Submit button on the Refresh Options... dialog for an options field, the drop-down list for that field is populated with values that are determined by the values that you submitted on the Refresh Options... dialog.

Process Type

Process/Job Name

Server Name

Output Destination Type

Output Destination Format

Viewing a PeopleSoft Task Instance

When a PeopleSoft task is launched, the Controller creates a task instance record of that task.

A task instance contains detailed information about a single execution of that task.

You can access a task instance from:

PeopleSoft Task Instance Details

The following PeopleSoft Task Instance Details contains information on the execution of the task shown in the PeopleSoft Task Details.
 

PeopleSoft Task Instance Details Field Descriptions

The following table describes the fields, buttons, and tabs that display in PeopleSoft Task Instance Details.

Field Name

Description

General

This section contains general information about the task instance.

Instance Name

Name of this task instance.

Instance Number

System-supplied; Sequentially assigned number, maintained per task, representing the creation order of the instance.

Description

Description of this record. Maximum length is 255 characters.

Member of Business Services

User-defined; Allows you to select one or more Business Services that this record belongs to.  (You also can Check All or Uncheck All Business Services for this record.)

You can select up to 62 Business Services for any record type, and enter a maximum of 2048 characters for each Business Service.

If the Business Service Visibility Restricted Universal Controller system property is set to true, depending on your assigned (or inherited) Permissions or Roles, Business Services available for selection may be restricted.

Task

Name of the task that was run to create this task instance. Click the icon to display Task Details for the task.

Source Version

Version of the task that was run to create this task instance.

Launch Source

System-supplied; Source from which this task was launched.

Options:

  • Scheduled Trigger

    If the instance was directly launched by a scheduled trigger, the Trigger (trigger_id) column is assigned the UUID of the scheduled trigger.
  • Trigger Monitor

    If the instance is a monitor associated with monitor trigger, the Trigger (trigger_id) column is assigned the UUID of the monitor trigger.
  • Trigger Now / User Interface

    If the instance was directly launched by a Trigger Now command, the Trigger (trigger_id) column is assigned the UUID of the trigger.
  • Trigger Now / System Operation

    If the instance was directly launched by a Trigger Now command, the Trigger (trigger_id) column is assigned the UUID of the trigger and the Source Instance (source_instance) column will be assigned the UUID of the instance invoking the System Operation.
  • Trigger Now / Web Service

    If the instance was directly launched by a Trigger Now command, the Trigger (trigger_id) column is assigned the UUID of the trigger.
  • Trigger Now / Command Line
    If the instance was directly launched by a Trigger Now command, the Trigger (trigger_id) column is assigned the UUID of the trigger.

  • Workflow

    If the instance was launched by a workflow, the Workflow (workflow_id) column is assigned the UUID of the workflow instance.  Likewise, the Source Instance (source_instance) column will also be assigned the UUID of the workflow instance.
  • Launch Task / User Interface

    If the instance was directly launched by the Launch Task command, the Source Instance (source_instance) column will be null.
  • Launch Task / System Operation

    If the instance was directly launched by the Launch Task command, the Source Instance (source_instance) column will be assigned the UUID of the instance invoking the System Operation.
  • Launch Task / Web Service

    If the instance was directly launched by the Launch Task command, the Source Instance (source_instance) column will be null.
  • Launch Task / Command Line
    If the instance was directly launched by the Launch Task command, the Source Instance (source_instance) column will be null.

  • Recurring

    If the instance was directly launched by a Recurring Task Instance, the Source Instance (source_instance) column will be assigned the UUID of the Recurring Task Instance.

Source Instance

System-supplied; UUID of the source instance.

  • If the instance was directly launched by a Trigger Now command; the UUID of the instance invoking the System Operation.
  • If the instance was launched by a workflow; the UUID of the workflow instance.
  • If the instance was directly launched by the Launch Task command; the UUID of the instance invoking the System Operation.
  • If the instance was directly launched by a Recurring Task Instance; the UUID of the Recurring Task Instance.

Invoked by

System-supplied; how the task instance was launched.

Options:

  • Trigger: (Trigger Name)
    Instance was launched by the named trigger.
  • Workflow: (Workflow Name)
    Instance was launched by the named workflow.
  • Manually Launched
    Instance was launched by a user. To identify the user, check the Execution User column for that task instance on the Task Instances screen or, on most task instance screens, the Execution User field.

Execution User

System-supplied; If the task was launched manually; ID of the user who launched it.

Calendar

Calendar associated with the task instance.

Time Zone Preference

User-defined; Allows you to specify the time zone that will be applied to the task.

Options:

  • – System Default –
    Time zone is based on the value of the Task Time Zone Preference Universal Controller system property: Server or Inherited.
  • Server (xxx)
    Where (xxx) is the time zone ID of the server; time zone is evaluated in the time zone of the server.
  • Inherited
    Time zone is evaluated in the time zone of the Parent Workflow or Trigger / Launch specification in the case there is no Parent Workflow.

Virtual Resource Priority

Priority for acquiring a resource when two or more tasks are waiting for the resource. This priority applies to all resources required by the task.

Options: 1 (high) - 100 (low).

Default is 10.

Hold Resources on Failure

If enabled, the task instance will continue to hold Renewable resources if the task instance fails. Renewable resources will be returned only if the task instance status is either Complete, Finished, or Skipped.

Mutually Exclusive With Self

If enabled, the task will not be allowed to run concurrently with itself. Task will not start until the instance that is running finishes. An instance will transition to Exclusive Wait status if it cannot start due to another instance already running. 

Simulate 

Specifies if the instance should execute under simulation mode

Status

This section contains information about the current status of the task instance.

Status

System-supplied; see Task Instance Statuses



Exit Code

System-supplied; the exit code captured by the Agent when executing the task (for example, a command or script).

Status Description

System-supplied; additional information, if any, about the status of the task instance.

Operational Memo

User-defined operational memo.

Evaluation Time

If time zone of user is different than time zone of task instance; Time at which Execution Restrictions and Run Criteria were evaluated based upon the requested time zone. (Time zone of task instance displays in parentheses.)

Critical

Indicates that this task is in the Critical Path of a workflow.

Critical Endpoint 

Indicates that this task was defined as a Critical Endpoint of a Critical Path in a workflow. 

Wait Until Time

Amount of time calculated to wait before the task was started, based on Wait To Start and Delay On Start times.

Queued Time

System-supplied; Date and time the task was queued for processing.

Trigger Time

System-supplied; Date and time the task instance was triggered.

Launch Time

System-supplied; Date and time the task instance was launched.

Start Time

System-supplied; Date and time the task instance started.

End Time

System-supplied; Date and time the task instance completed.

Duration

System-supplied; amount of time the task instance took to run.

Run Status

Status of the PeopleSoft process being monitored on the PeopleSoft Process Scheduler

Distribution Status

Displays the distribution status for reports associated with the main (parent) process being monitored on the PeopleSoft system.

Process Instance

The Instance ID (generated by the PeopleSoft system) associated with the process being monitored on the PeopleSoft system.

Agent Details

This section contains assorted detailed information about the Agent / Agent Cluster selected for this task.

Cluster

Indication that selecting a Utility Agent Cluster is required.  If Cluster is selected, selecting a Utility Agent is not required unless Utility Agent Variable is selected.

Utility Agent

Name of the Agent resource that identifies the machine where the operation will run. If you do not specify a Utility Agent, you must specify a Utility Agent Cluster or Utility Cluster Broadcast.

Utility Agent Variable

If enabled, the Utility Agent field converts from a reference field (where you browse and select a record) into a text field that allows you to enter a variable. Use the format:

${variable name}.

The variable must be a supported type as described in Variables and Functions.
 

Note

When updating multiple Tasks, to change from using a Utility Agent reference to using a Utility Agent variable, you must change the Utility Agent Variable field to Yes and specify the Utility Agent variable in the Utility Agent Unresolved field. Conversely, to change from using a Utility Agent variable to using a Utility Agent reference, you must change the Utility Agent Variable field to No and specify the Utility Agent reference in the Utility Agent field.

Utility Agent Cluster

If Cluster is selected; Group of Agents, one of which the Controller will choose to run this task. You can specify a Utility Agent Cluster in addition to or in place of a specific Utility Agent. If you specify a Utility Agent and a Utility Agent Cluster, the Controller first tries to run the task on the specific Utility Agent. If the Utility Agent is not available, the Controller reverts to the Utility Agent Cluster. See Agent Clusters for more information.

Utility Agent Cluster Variable

Indication of whether the Utility Agent Cluster field is a reference field for selecting a specific Agent Cluster (unchecked) or a text field for specifying the Utility Agent Cluster as a variable (checked). Use the format:

${variable name}.

The variable must be a supported type as described in Variables and Functions.
 

Note

When updating multiple Tasks, to change from using a Utility Agent Cluster reference to using a Utility Agent Cluster variable, you must change the Utility Agent Cluster Variable field to Yes and specify the Utility Agent Cluster variable in the Utility Agent Cluster Unresolved field. Conversely, to change from using a Utility Agent Cluster variable to using a Utility Agent Cluster reference, you must change the Utility Agent Cluster Variable field to No and specify the Utility Agent Cluster reference in the Utility Agent Cluster field.

Utility Credentials


Login credentials that the Agent will use to access the Universal Command server machine.

Required if the Agent Credentials Required Universal Controller system property is true.

Utility Credentials Variable

Indication of whether the Utility Credentials field is a reference field for selecting a specific Credential (unchecked) or a text field for specifying the Utility Credentials as a variable (checked). Use the format: ${variable name}. The variable must be a supported type as described in Variables and Functions.
 

Note

When updating multiple Tasks, to change from using a Utility Credentials reference to using a Utility Credentials variable, you must change the Utility Credentials Variable field to Yes and specify the Utility Credentials variable in the Utility Credentials Unresolved field. Conversely, to change from using a Utility Credentials variable to using a Utility Credentials reference, you must change the Utility Credentials Variable field to No and specify the Utility Credentials reference in the Utility Credentials field.

PeopleSoft Details

This section contains assorted detailed information about the task.

PeopleSoft Connection


Name of the PeopleSoft connection. The PeopleSoft connection specifies information about the PeopleSoft server. Select an existing PeopleSoft Connection from the drop-down list or click the icon to create a new PeopleSoft Connection.

PeopleSoft Connection Variable

Indication of whether the PeopleSoft Connection field is a reference field for selecting a specific PeopleSoft Connection (unchecked) or a text field for specifying the PeopleSoft Connection as a variable (checked). Use the format: ${variable name}.

The variable must be a supported type as described in Variables and Functions.
 

Note

When updating multiple Tasks, to change from using a PeopleSoft Connection reference to using a PeopleSoft Connection variable, you must change the PeopleSoft Connection Variable field to Yes and specify the PeopleSoft Connection variable in the PeopleSoft Connection Unresolved field. Conversely, to change from using a PeopleSoft Connection variable to using a PeopleSoft Connection reference, you must change the PeopleSoft Connection Variable field to No and specify the PeopleSoft Connection reference in the PeopleSoft Connection field.

PeopleSoft Credentials


Login credentials that the Controller will use to access the PeopleSoft system. The credentials are stored in the Universal Controller credentials table; see Credentials.
 

Note

Either the PeopleSoft Connection or the PeopleSost task using that connection must specify PeopleSoft Credentials. If a PeopleSoft task using the PeopleSoft Connection specifies PeopleSoft Credentials, those PeopleSoft task credentials override the PeopleSoft Connection credentials.

PeopleSoft Credentials Variable

Indication of whether the Credentials field is a reference field for selecting a specific Credential (unchecked) or a text field for specifying the Credential as a variable (checked). Use the format: ${variable name}.

The variable must be a supported type as described in Variables and Functions.
 

Note

When updating multiple Tasks, to change from using a Credentials reference to using a Credentials variable, you must change the Credentials Variable field to Yes and specify the Credentials variable in the Credentials Unresolved field. Conversely, to change from using a Credentials variable to using a Credentials reference, you must change the Credentials Variable field to No and specify the Credentials reference in the Credentials field.

Command

PeopleSoft command to execute.

Options:

  • Schedule Process
    Schedule a process.
  • Schedule Job
    Schedule a job.
  • Run Jobset
    Run a job.

Default is Schedule Process.

Run Control ID

If Command = Schedule Process or Schedule Job; Run control ID to be used for the process submission.

Process Type

If Command = Schedule Process or Schedule Job; Specific type of PeopleSoft process. (If Command = Schedule Job, Process Type defaults to PSJob and is read-only.)

Process/Job Name

If Command = Schedule Process or Schedule Job; Name of the PeopleSoft process/job.

Server Name

If Command = Schedule Process or Schedule Job; Specific server name. If Command = Schedule Process or Schedule Job; Specific server name.

Output Destination Type

If Command = Schedule Process or Schedule Job; Type of output for the submitted process.

Output Destination Format

If Command = Schedule Process or Schedule Job; Override of the default output format for the submitted process.

Output Destination String

If Command = Schedule Process or Schedule Job; File path or printer destination for the output.

Process File Name

If Command = Schedule Process or Schedule Job; Dependent file name.

Main Schedule Name

If Command = Run Jobset; Name of the jobset schedule.

Main Job Name

If Command = Run Jobset; Name of the job within the jobset schedule.

Print Distribution List

Specification for whether or not the report-recipient distribution list is included in the Job Report.

Print Parameter List

Specification for whether or not the parameter list job items are included in the Job Report.

Print Application Message

Specification for whether or not the application messages for the monitored processes are included in the Job Report.

Print System Message

Specification for whether or not the application messages for the monitored processes are included in the Job Report.

Print Job Tree

Specification for whether or not the job tree is included in the Job Report.

Report

Specification for whether or not reports associated with a process are returned.

Content Filter

Comma-delimited list of report file suffixes that will not be returned. For example: pdf,xls

PeopleSoft Distribution Details

If Command = Schedule Process or Schedule Job; This section contains assorted distribution details about the task.

Report Folder Name

If Command = Schedule Process or Schedule Job; Folder in which the report will be viewed in Report Manager.

Retention Days

If Command = Schedule Process or Schedule Job; Number of days that reports generated by the submitted process should be retained by the system.

Email Address List

If Command = Schedule Process; List of email addresses, separated by semicolons.

Email Subject

If Command = Schedule Process; Subject line of the email. If not specified, the default subject line is used.

Email Text

If Command = Schedule Process; Body of the email. If not specified, the default body message is used.

Email With Log

If Command = Schedule Process; Indication (checked or unchecked) for whether or not to attach log files resulting from the Structured Query Report. Only applicable if Process Type = SQR Report.

Email Web Report

If Command = Schedule Process; Indication (checked or unchecked) for whether or not to include a link to the completed report output. Only applicable if Output Destination Type = WEB.

Distribution Options

If Command = Schedule Process; Recipients of the process output

To add an option, click the + icon and enter:

  • Distribution Id Type: User or Role
  • Distribution Id

To delete an option, select in the list of variables and click the - icon.

Result Processing Details This section contains assorted detailed information about result processing for this task.

Exit Code Processing

Specifies how the Controller should determine whether the executed command failed or completed successfully.

Options:

  • Success Exitcode Range
    Command is considered completed successfully if its exit code falls within the range specified in the Exit Codes field.
  • Failure Exitcode Range
    Command is considered failed if its exit code falls within the range specified in the Exit Codes field.
  • Success Output Contains
    Command is considered completed successfully if its output contains the text specified in the Scan Output For field.
  • Failure Output Contains
    Command is considered failed if its output contains the text specified in the Scan Output For field.
  • Step Conditions (z/OS only)
    Command is considered completed successfully/failed if any of its specified condition codes falls within the range specified under the Step Conditions tab (see Creating Step Conditions).

Output Type

Required if Exit Code Processing = Success Output Contains or Failure Output Contains; type of output.

Options:

  • Standard Output (STDOUT)
  • Standard Error (STDERR)
  • File
  • Extension

Scan Output For

Required if Exit Code Processing = Success Output Contains or Failure Output Contains; text for which the Controller should scan the output file. The Controller will process this field as a regular expression.

Output File (for Exit Code Processing)

Required if Output Type = File; path and file name of the output file that should be scanned for the text in the Scan Output For field.

Exit Codes

Required if Exit Code Processing = Success Exitcode Range or Failure Exitcode Range; range of exit codes. Format: Numeric. Use commas to list a series of exit codes; use hyphens to specify a range. Example: 1,5, 22-30.

Variables are supported.

Automatic Output Retrieval

Specifies whether you want the Controller to automatically retrieve any output from the job and attach it to the task instance record.

Options:

  • None
    Do not attach any output to the task instance record.
  • Standard Output
    Attach all standard output.
  • Standard Error
    Attach standard error output.
  • File
    Attach the file specified in the Output File field.
  • Standard Output/Error
    Attach all standard output and standard error output.
     

Note

Tasks specifying Automatic Output Retrieval will fail with Start Failure if the Agent Output Prohibited field is true in the Details of the specified Agent.

Wait For Output

If Automatic Output Retrieval = Standard Output, Standard Error, File, or Standard Output/Error, and Failure Only is not enabled (checked); Specification that the task should wait for the requested output before completing.

Failure Only

If Automatic Output Retrieval = Standard Output, Standard Error, File, or Standard Output/Error, and Wait For Output is not enabled (checked); Indication for whether output should be retrieved on task failure only.

Start Line

If Automatic Output Retrieval = Standard Output, Standard Error, File, or Standard Output/Error; Instructs the Controller to retrieve data beginning at the line indicated.

  • If a Start Line value is not specified, the default is 1.
  • If the Start Line value is -1, data will be retrieved starting at the end of the file.

Number of Lines

If Automatic Output Retrieval = Standard Output, Standard Error, File, or Standard Output/Error; Allows you to limit the retrieved data to the number of lines specified. If a Number of Lines value is not specified, the default is the value of the Retrieve Output Default Number Of Lines Universal Controller system property.

Scan Text

If Automatic Output Retrieval = Standard Output, Standard Error, File, or Standard Output/Error; Regex pattern that the Controller will search for a match for in STDOUT/STDERR or a specified file. The Controller will include the Number of Lines above and below the first line matched.
 
if the Regex pattern is not found, the following message is returned: OPSWISE WARNING - Scan text string not found.

Output File (for Automatic Output Retrieval)

Required if Automatic Output Retrieval = File; path and file name containing the output that you want automatically retrieved and attached to the task instance.

Retry Options

This section contains specifications for retrying the task.

Maximum Retries

User-defined; maximum number of times that the Controller should retry this task after it has started and gone to a failed state.

Retry Indefinitely

User-defined; indicates whether the Controller should continue trying indefinitely to run this task. If you enable this field, it overrides any value placed in the Maximum Retries field.

Retry Interval (Seconds)

User-defined; number of seconds between each retry.

Current Retry Count

System-supplied; current number of times that the Controller has retried the task after it first went to failure status.

Suppress Intermediate Failures

User-defined; If the task instance is in the Failed status, indicates whether or not the following will be suppressed until all scheduled retry attempts (a Maximum Retries value has been entered or Retry Indefinitely has been enabled) have been made:

  • Workflow conditional path processing; any Successors waiting on a failure path will not be released.

  • Task Monitors will not be notified of the Failed status. Also, any Task Monitor task that has a Time Scope in the past will disqualify any matching task instance in the past with a Failed status if the task instance is scheduled for automatic retry and for which Suppress Intermediate Failures has been enabled.

  • Any Workflow containing the Failed task instance will not transition to the Running/Problems status.


Next Retry Time

System-supplied for a task instance in the Failed status that is scheduled for automatic retry; Next time that a retry will be made. If a task instance is not scheduled for automatic retry, Next Retry Time does not display in the task instance Details.

Wait / Delay Options

This section contains specifications for waiting to start and/or delaying on start the task.

Wait To Start

Amount of time to wait before starting a task from the time that it was launched.
 
Options are:

  • – None –
  • Time
  • Relative Time
  • Duration
  • Seconds

Wait Time

If Wait To Start = Time or Relative Time; Time of day (in 24-hour time) to wait until before starting the task. 

Wait Day Constraint

If Wait To Start = Time or Relative Time; Specification for whether or not to advance the wait time to another day.

Valid values:

  • -- None --
    • If Wait To Start = Time; Advance to the next day if the specified wait time is before the time that the task instance is eligible to start; that is, all dependencies have been met. For example: it is not being held, and it is not waiting on any predecessors.
    • If Wait To Start = Relative Time; Advance to the next day if the specified wait time is before the task instance Trigger Time or, if there is no Trigger Time, before the task instance Launch Time. In the latter case, when a task instance is within a workflow, it will inherit the Launch Time of the top-level parent workflow task instance.
  • Same Day
    Do not advance day.
  • Next Day
    Advance to the next day.
  • Next Business Day
    Advance to the next business day.
  • Sunday
    If today is not Sunday, advance to next Sunday.
  • Monday
    If today is not Monday, advance to next Monday.
  • Tuesday
    If today is not Tuesday, advance to next Tuesday.
  • Wednesday
    If today is not Wednesday, advance to next Wednesday.
  • Thursday
    If today is not Thursday, advance to next Thursday.
  • Friday
    If today is not Friday, advance to next Friday.
  • Saturday
    If today is not Saturday, advance to next Saturday.

Default is – None --.

Wait Duration

If Wait To Start = Duration; Number of days, hours, minutes, and seconds to wait before starting the task.

Wait Duration In Seconds

If Wait To Start = Seconds; Number of seconds to wait before starting the task.

Delay On Start

Amount of time to delay the start of a task, after it has been launched, from the time that it is eligible to start; that is, all dependencies have been met. For example: it is not being held, it is not waiting on any predecessors, or there is no wait time specified.
 
Options are:

  • – None –
  • Duration
  • Seconds

Delay Duration

If Delay On Start = Duration; Number of days, hours, minutes, and seconds to delay after starting the task.

Delay Duration In Seconds

If Delay On Start = Seconds; Number of seconds to delay after starting the task.

Time Options

This section contains time-related specifications for the task instance.

Late Start

If enabled, and if the task instance starts after the time or period specified, the task instance is flagged as late. You can specify a time or duration to determine a late start (see Late Start Type). To determine whether a task instance started late, open the task instance and locate the Started Late field; the field is checked if the instance started after the specified time. The Started Late field displays in the task instance Details only if the user specified a Late Start in the task Details.

Started Late

System-supplied; this field is flagged if the task started later than the time specified in the Late Start fields.

Late Start Type

Required if Late Start is enabled.

Options:

  • Time - Flag the task if it starts after the specified time.
  • Duration - Flag the task if it starts a certain amount of time after the programmed start time. The task must have a specific start time.

Late Start Time

If Late Start Type = Time; Time after which the task start time is considered late. Use HH:MM, 24-hour time.

Late Start Day Constraint

If Late Start Type = Time; Specification for whether or not to advance the late start time to another day.
 
Valid values:

  • -- None --
    Advance to the next day if the specified late start time is before the Created time of the task instance.
  • Same Day
    Do not advance day.
  • Next Day
    Advance to the next day.
  • Next Business Day
    Advance to the next business day.
  • Sunday
    If today is not Sunday, advance to next Sunday.
  • Monday
    If today is not Monday, advance to next Monday.
  • Tuesday
    If today is not Tuesday, advance to next Tuesday.
  • Wednesday
    If today is not Wednesday, advance to next Wednesday.
  • Thursday
    If today is not Thursday, advance to next Thursday.
  • Friday
    If today is not Friday, advance to next Friday.
  • Saturday
    If today is not Saturday, advance to next Saturday.
  • Nth Day
    Advance to a specific number of days in the future.

Default is – None --.

Late Start Nth Amount

If Late Start Day Constraint = Nth Day; Number of days to advance.

Late Start Duration

If Late Start Type = Duration; Duration (amount of relative time) after which the task is considered to have started late.

For a task within a workflow, the duration is the period between the time the workflow starts and the time the task itself starts. For example, a task might have a Late Start Duration of 60 minutes. If the workflow starts at 9:00 a.m. but the task itself does not start until 10:30, the task has started late.

For a task that is not within a workflow, Late Start Duration has meaning only if the task has been held upon starting. For example, if a task has a Late Start Duration of 60 minutes and the Hold on Start field is enabled, if the task is not released from hold within the amount of time specified in the Late Start Duration field, the task has started late.

Computed Late Start Time

If Late Start is enabled, the computed Date/Time for when the task instance will be Late Started.

Late Finish

If enabled, and if the task instance finishes after the time or period specified, the task instance is flagged as late. You can specify a time or duration to determine a late finish (see Late Finish Type). To determine whether a task instance finished late, open the task instance and locate the Finished Late field; the field is checked if the instance finished after the specified time or lasted longer than expected. This field only appears on the task instance if the user specified a Late Finish in the task definition.

Finished Late

System-supplied; this field is flagged if the task finished later than the time or duration specified in the Late Finish fields.

Late Finish Type

Required if Late Finish is enabled.

Options:

  • Time - Flag the task if it finishes after the specified time (see Late Finish Time).
  • Duration - Flag the task if it finishes a certain amount of time after the programmed finish time (see Late Finish Duration). The task must have a specific finish time.
  • Average Duration - Flag the task if it finishes before the average duration (see Average Instance Time) for the task, less an offset (see Late Finish Offset Type), if specified.

Late Finish Offset Type

If Late Finish Type = Average Duration;

Options:

  • Percentage
  • Duration

Late Finish Percentage Offset ( + )

Required if Late Finish Offset Type = Percentage; Percentage of Average Duration to use as an offset.  The late finish time is calculated by adding the offset to the Average Duration.

Late Finish Duration Offset ( + )

Required if Late Finish Offset Type = Duration; Duration to use as an offset.  The late finish time is calculated by adding the offset to the Average Duration

Late Finish Duration Offset Unit

If Late Finish Offset Type = Duration;

Options:

  • Seconds
  • Minutes
  • Hours

Late Finish Time

If Late Finish Type = Time; Time after which the task finish time is considered late. Use HH:MM, 24-hour time.

Late Finish Day Constraint

If Late Finish Type = Time; Specification for whether or not to advance the late finish time to another day.
 
Valid values:

  • -- None --
    Advance to the next day if the specified late finish time is before the Created time of the task instance.
  • Same Day
    Do not advance day.
  • Next Day
    Advance to the next day.
  • Next Business Day
    Advance to the next business day.
  • Sunday
    If today is not Sunday, advance to next Sunday.
  • Monday
    If today is not Monday, advance to next Monday.
  • Tuesday
    If today is not Tuesday, advance to next Tuesday.
  • Wednesday
    If today is not Wednesday, advance to next Wednesday.
  • Thursday
    If today is not Thursday, advance to next Thursday.
  • Friday
    If today is not Friday, advance to next Friday.
  • Saturday
    If today is not Saturday, advance to next Saturday.
  • Nth Day
    Advance to a specific number of days in the future.

Default is – None --.

Late Finish Nth Amount

If Late Finish Day Constraint = Nth Day; Number of days to advance.

Late Finish Duration

If Late Finish Type = Duration; Longest amount of time this task instance should take to run.

Computed Late Finish Time

If Late Finish is enabled, the computed Date/Time for when the task instance will be Late Finished.

Early Finish

If enabled, and if the task instance finishes before the time or period specified, the task instance is flagged as early. You can specify a time or duration to determine an early finish (see Early Finish Type). To determine whether a task instance finished early, open the task instance and locate the Finished Early field; the field is checked if the instance finished before the specified time or did not last as long as expected. This field only appears on the task instance if the user added Early Finish specifications to the task definition.

Finished Early

System-supplied; this field is flagged if the task finished earlier than the time specified in the Early Finish fields.

Early Finish Type

Required if Early Finish is enabled.

Options:

  • Time - Flag the task if it finishes before the specified time (see Early Finish Time).
  • Duration - Flag the task if it finishes a certain amount of time before the programmed finish time (see Early Finish Duration). The task must have a specific finish time.
  • Average Duration - Flag the task if it finishes before the average duration (see Average Instance Time) for the task, less an offset (see Early Finish Offset Type), if specified.

Early Finish Offset Type

If Early Finish Type = Average Duration;

Options:

  • Percentage
  • Duration

Early Finish Percentage Offset ( - )

Required if Early Finish Offset Type = Percentage; Percentage of Average Duration to use as an offset.  The early finish time is calculated by subtracting the offset from the Average Duration.

Early Finish Duration Offset ( - )

Required if Early Finish Offset Type = Duration; Duration to use as an offset. The early finish time is calculated by subtracting the offset from the Average Duration.

Early Finish Duration Offset Unit

If Early Finish Offset Type = Duration;

Options:

  • Seconds
  • Minutes
  • Hours

Early Finish Time

If Early Finish Type = Time; Time before which the task finish time is considered early. That is, enter a time at which the task should still be running. Use HH:MM, 24-hour time.

Early Finish Day Constraint

If Early Finish Type = Time; Specification for whether or not to advance the early finish time to another day.

 
Valid values:

  • -- None --
    Advance to the next day if the specified early finish time is before the Created time of the task instance.
  • Same Day
    Do not advance day.
  • Next Day
    Advance to the next day.
  • Next Business Day
    Advance to the next business day.
  • Sunday
    If today is not Sunday, advance to next Sunday.
  • Monday
    If today is not Monday, advance to next Monday.
  • Tuesday
    If today is not Tuesday, advance to next Tuesday.
  • Wednesday
    If today is not Wednesday, advance to next Wednesday.
  • Thursday
    If today is not Thursday, advance to next Thursday.
  • Friday
    If today is not Friday, advance to next Friday.
  • Saturday
    If today is not Saturday, advance to next Saturday.
  • Nth Day
    Advance to a specific number of days in the future.

Default is – None --.

Early Finish Nth Amount

If Early Finish Day Constraint = Nth Day; Number of days to advance.

Early Finish Duration

If Early Finish Type = Duration; Shortest amount of time this task instance should take to run.

Projected Late

System-provided if Late Start Time, Late Start Duration, or Late Finish Time is specified; This field is flagged if the task instance is projected to be late based on critical path projected end times (see Critical Path Projected Late Action Maximum and Critical Path Projected Late Threshold In Minutes Universal Controller system properties).

Critical Path Options

This section contains Critical Path-related specifications for the task.

CP Duration

Optional; Allows you to override the estimated Critical Path Duration of the task when running in a Workflow; used in conjunction with the CP Duration Unit field. In most cases, this field should be left blank, which implies that the Controller will estimate the Critical Path Duration based on historical executions. Valid values are any integer equal to or greater than 0. Variables and Functions are supported.

CP Duration (Resolved)

Displays the current resolved value of the CP Duration field, which may contain variables or functions that will be displayed as unresolved until the task instance starts. The CP Duration (Resolved) field can continue to change value until the task instance starts, at which time CP Duration will display as resolved and CP Duration (Resolved) will no longer be visible unless there was an issue resolving the variables and/or functions contained within CP Duration. If the Controller is unable to resolve CP Duration or it resolves to an invalid value, CP Duration will be ignored and the Controller will estimate the Critical Path Duration based on historical executions.

CP Duration Unit

Type of CP Duration; used in conjunction with the CP Duration field. For example, for a CP Duration of two minutes, specify 2 in the CP Duration field and select Minutes in this field.
 

Options:

  • Seconds
  • Minutes
  • Hours

Default is Minutes.



Workflow Execution Options

This section contains Execution Restriction specifications for the task if it is within a Workflow.

Execution Restriction

Specification for whether or not there is a restriction for this task to be run, skipped, or held.

Options are:

  • -- None -- No restriction for this task.
  • Run Restriction for when this task will be run.
  • Skip Restriction for when this task will be skipped.
  • Hold Restriction for when this task will be held.

If Execution Restriction on a task is Run or Skip, then when it is part of a Workflow that is being launched, the Restriction Period is evaluated. The task instance will be skipped if Execution Restriction is Skip and the date is within the Restriction Period or Execution Restriction is Run and the date is not within the Restriction Period. Execution Restriction can be set to Skip with a Restriction Period of - None -, meaning the restriction is always active and the task will be skipped when it is part of a Workflow.

Restriction Period

If Execution Restriction = Run, Skip, or Hold; Period of time when the task is restricted.

Options are:

  • – None –
    No period of restriction for this task.
  • Before
    Restriction is valid if the date is before the Before Date value.
  • After
    Restriction is valid if the date is after the After Date value.
  • Span
    Restriction is valid if the date is before the Before Date value and after After Date value.
  • On
    Restriction is valid if the date is one of the Date List values.

Before Date

If Restriction Period = Before or Span; Date before which the restriction is valid.

Before Time

If Restriction Period = Before or Span; Time on the selected date before which the restriction is valid.

After Date

If Restriction Period = After or Span; Date after which the restriction is valid.

After Time

If Restriction Period = After or Span; Time on the selected date after which the restriction is valid.

Date List

If Restriction Period = On; Date(s) on which the restriction is valid.

Statistics

This section contains time-related statistics for the task instance.

User Estimated End Time

System-supplied; If the user entered information into the User Estimated Duration field in the task Details, the Controller uses this information to calculate an end time for the task instance, based on the date/time the task instance started.

Lowest Estimated End Time

System-supplied; Lowest estimated end time of the task instance, calculated by the Controller based on the date/time the task instance started.

Average Estimated End Time

System-supplied; Average estimated end time of the task instance, calculated by the Controller based on the date/time the task instance started.

Highest Estimated End Time

System-supplied; Highest estimated end time of the task instance, calculated by the Controller based on the date/time the task instance started.

Projected Start Time

System-supplied; projected start time of the task instance, calculated by the Controller based on Projected End Time minus Projected Duration. 

Projected End Time

System-supplied; projected end time of the task instance, calculated by the Controller based on the projected end time of its predecessor (or the maximum projected end time of all its predecessors, if more than one path exists to that task instance) plus its estimated critical path duration.

Metadata

This section contains Metadata information about this record.

UUID

Universally Unique Identifier of this record.

Updated By

Name of the user that last updated this record.

Updated

Date and time that this record was last updated.

Created By

Name of the user that created this record.

Created

Date and time that this record was created.

Status History

History of all statuses that the task instance has gone through.

Buttons

This section identifies the buttons displayed above and below the Task Instance Details that let you perform various actions.

Update

Saves updates to the record.

Force Finish

Hold


Places the task instance on Hold (see Putting a Task on Hold).

Skip


For tasks loaded into the schedule that have not yet run; allows you to tell the Controller to skip this task. See Skipping a Task.

Re-run

See Re-running a Task Instance.

Note

If the Re-run (Suppress Intermediate Failures) Permitted Universal Controller system property is set to true, the Re-run button is a drop-down list containing the following options:

  • Re-run
  • Re-run (Suppress Intermediate Failures)

The Re-run button does not display if the task instance does not qualify for Re-run.

If the task instance qualifies for Re-run, but already has Retry Options enabled, Re-run (Suppress Intermediate Failures) displays as disabled in the drop-down list.

View Parent

Displays the task instance Details for the parent Workflow of this task instance.

Retrieve Output

Delete

Deletes the current record.

Refresh

Refreshes any dynamic data displayed in the Details.

Close

For pop-up view only; closes the pop-up view of this task instance.

Tabs

This section identifies the tabs across the top of the Task Instance Details that provide access to additional information about the task instance.

RunTime Parameters

See Adding RunTime Parameters, below.

Virtual Resources


Lists all Virtual Resources to which this task is assigned.
 
If you want to create a Task Virtual Resource for this task, you can select an existing Virtual Resource (or, optionally, first create a new Virtual Resource and then select it as the Task Virtual Resource) or enter a Virtual Resource variable. The variable must be a supported type as described in Variables and Functions.

Exclusive Requests


Lists all records in the Exclusive Requests table (ops_exclusive_order) for this task instance.

Output

Displays output generated from the process, if any, based on specifications provided by the user in the Automatic Output Retrieval fields in the task Details.

If automatic output retrieval was not available or was not selected, output can be obtained by clicking the Retrieve Output button.

Notes


Lists all notes associated with this record.

Adding RunTime Parameters

You can add one or more RunTime Parameters for each PeopleSoft task, and define the values for those parameters, as described below.

Adding a Parameter

Step 1

Open the PeoplsSoft task to which you want to add the parameter.

Step 2

Click the Runtime Parameters tab. The Runtime Parameters list displays a list of all Runtime Parameters for which values have been defined for this task.
 

Step 3

Click the  button to display RunTime Parameter Details.
 

 

Note

If the Command field in the PeopleSoft Details specifies Schedule Job, the RunTime Parameter Details also requires you to select a Process Name and Process Type.

Step 4

Click the refresh picker icon next to the Parameter Name field to select options for the RunTime Parameter.
 

Step 5

For each field on the Refresh Parameter Name Options... dialog, you can select from a list of values that may have changed since the last time that a value was selected.
 
Most of the fields on a Refresh Options... dialog are fields from the PeopleSoft Task Details, and the values for those fields in the dialog are, by default, the same as the values for the fields in the Details. You can keep the current values or change them from their drop-down lists.
 
When you click the Submit button on the Refresh Parameter Name Options... dialog, the drop-down list for the Parameter Name field in the RunTime Parameter Details is populated with values that are determined by the values that you submitted on the Refresh Parameter Name Options... dialog.

Step 6

Select a parameter from the drop-down list and enter a Parameter Value.

Step 7

Click the  button.

Deleting a RunTime Parameter

To delete a single RunTime Parameter for a task, either:

  • Right-click the parameter on the RunTime Parameters list and click Delete on the Action menu.
  • Open the RunTime Parameter record and click the Delete button.

Running a PeopleSoft Task

You can run a PeopleSoft task:

Monitoring Task Execution

You can monitor all system activity from the Activity Monitor and can view activity history from the History list.